The conveying capacity and tension required by customers for the materials transported by belt conveyor line will be different. For example, powder materials should be transported at low speed to prevent floating; brittle materials should be operated at medium speed to avoid jumping or breaking on the roller. Therefore, it is necessary to adjust the belt speed according to the actual situation. What if the required belt speed is determined?
1. Belt width. The smaller the width of the conveyor belt is, the more unstable it will be when it runs at high speed, and sometimes serious material scattering will occur.
2. For fixed belt conveyor, the installation quality is generally higher, so higher belt speed can be adopted; the speed of semi fixed and mobile conveyor should be lower.
3. When conveying horizontally or nearly horizontally, the speed can be higher. When the inclined belt conveyor is inclined, the larger the inclination angle is, the easier the material is to roll and slide on the conveyor belt when moving.
4. The larger the ton kilometer of conveying capacity is, the greater the running speed of the required belt strength is.
5. The impact of loading and material will cause the wear of conveyor belt, so the speed of short distance conveyor will be slowed down. However, in order to reduce the belt tension, long-distance conveyor often uses high-speed operation.
Source: Guangdong belt conveyorhttp://www.mebsp.com
07-02
Belt conveyor conveying speed is unfavorable use too fast
The quality of the delivery of materials or volume calculation; When transported into items, a number of delivery per hour to accounting. Transport belt conveyer delivery speed: progress speed transport ability to progress. In the ship to take for traction and length is larger, the delivery speed is increased. But high-speed belt conveyer to be attention to the problem of vibration and nois
07-02
Function of Guangdong bucket elevator in asphalt aggregate mixing
Asphalt mixing bucket elevator is a very important equipment in mixing. It is continuously discharged to the bucket type through the aggregate lifting of different scales of the dryer to improve the height of the vibrating screen gravel, stone grading standards, qualified stone particles to the asphalt mixing equipment, uniform mixing.Function of bucket elevator in asphalt aggregate mixingStone as
07-02
Guangdong bucket elevator fault analysis and Solutions
&Bucket elevator fault analysis and treatment planCause analysis and treatment of common problems of bucket elevator:1: hopper belt slippingBucket elevator is a kind of information about the use of conflicting torque between the belt and the elevator shaft of hopper head wheel. If the belt tension is insufficient, the hopper will lead to belt slip. At this time, the machine should be stopped immed
07-02
Causes of hopper falling of Guangdong bucket elevator
There are four reasons for the hopper falling of belt bucket elevator1. The direct cause of hopper falling and deformation is that too much material is fed into the machine frame and the lifting resistance is increased and the hopper is not running smoothly. At this time, the machine should be shut down immediately, the plug-in plate under the frame should be drawn out, the accumulated materials i